# Acceptance criteria for a small software project

Acceptance criteria tell you what a feature must do before you sign it off. Agree 3 things with the developer for each task you want to test. Note what needs to be in place, what the user will do and what they should see, then compare the result at handover.

## Describe the outcome

Suppose you sell printed signs. A sales assistant needs to quote for ten signs while a customer is on the phone. ‘The quote builder supports discounts’ leaves two people free to imagine different rules. Does the tenth sign qualify for a discount on the whole line, or just on that sign? Could an assistant send a quote without entering a quantity? These are decisions the person who owns the price list can make before a developer builds the screen.

Here's the price rule for this fictional shop. One sign costs 25.00 before tax. At ten or more identical signs, take ten per cent off the whole line. The assistant can enter any positive whole number of signs. The prices below are sample figures for the test.

A [custom quote builder](https://hyperhtml.nl/en/custom-quote-builder/) can do several jobs, from drafting the offer to sending a copy. Give each job its own check. For this one, the assistant enters a quantity, saves the quote and reopens it. They must see the correct line total both before saving and after reopening the quote.

## Use a known test input

Set up one sample product called Window sign, with a unit price of 25.00. Use a test customer on the standard price list. Switch off any special customer discounts or delivery charges for this exercise. Use the sales assistant's normal permissions, since an administrator may be allowed to override a price. Start each row below with a fresh draft so the previous discount cannot carry over.

Choose 9 signs and then 10. A test with 20 would show you that a discount exists somewhere, but it could still miss a rule that begins at 11. The pair on either side of the cut-off tells you exactly where the price changes. Try zero for the third row. This shows what a person at the counter can do after an entry mistake.

## Record the expected result

Calculate the answers independently and keep them next to the test. Here is a fictional run on a quote builder. The final column shows both the observed result and who takes the next action.

| Input | Expected result | Example result and owner |
|---|---|---|
| 9 signs at 25.00 | 9 × 25.00 = 225.00. Both before saving and after reopening, the quote shows 9 signs, no discount and a total of 225.00. | Pass. The sales assistant saw 9 signs, no discount and a total of 225.00 each time. |
| 10 signs at 25.00 | 10 × 25.00 = 250.00. Both before saving and after reopening, the quote shows 10 signs, a discount of 25.00 and a total of 225.00. | Fail. The total was 225.00 on screen. After reopening, all 10 signs were there, but the discount had gone and the total was 250.00. The developer will fix it and the sales assistant will test it again. |
| 0 signs at 25.00 | The form asks for at least one sign and keeps the draft open. It creates no quote number or total. | Pass. The assistant saw the message asking for at least one sign. The open draft had no number or total, and the assistant could correct the quantity. |

The totals in the first two rows happen to match. Check the quantity and discount as well as the final total. An old total left on screen could otherwise pass both tests.

## Decide what counts as a defect

The second row exposes a defect against an agreed rule. Someone could give the customer one figure on the phone and later send a different figure from the saved quote. Record the test version, draft reference, entered quantity and both totals. Repeating the exact sequence on that version gives the developer something concrete to investigate.

Now suppose the owner asks for the discount to apply across a mix of signs and banners. The agreed rule covers identical signs. Record the mixed order as a separate request and ask for its effect on the price and timetable. If the original wording never said whether quantities could be combined, ask the owner to settle that question and put the answer beside the test before calling it a failure.

The same approach works for other [small business software projects](https://hyperhtml.nl/en/custom-software-development/). If you need a report every Monday, specify which transactions count, which time zone sets the cut-off and who can open the result. Give the tester a small set of transactions and an expected total they can check without using the report itself.

## Sign-off and outstanding items

At sign-off, record the version, who tested it, which checks passed and what is still open. In this example the buyer wants the saved quote to show the same total they gave the customer over the phone. Record that this part is awaiting a fix. The developer will supply a new version and the sales assistant will repeat the test.

When the fix arrives, reopen a newly saved ten-sign quote. Check the nine-sign case again in case the change moved the discount boundary. If someone has already saved an incorrect example, agree whether that existing quote also needs correcting and test it separately. A fix for new quotes tells you little about a quote already sitting in the list.

For a change you decide to buy, attach the revised rule and the additional example to the agreed scope. If you are choosing how to commission the work, compare [fixed-price and time-based software projects](https://hyperhtml.nl/en/compare/fixed-price-vs-time-and-materials/). In either arrangement, the person approving the result needs a record of which rule applied to this delivery.

## Questions about accepting software

### What are acceptance criteria in software?

They are observable conditions you agree to use when deciding whether a feature meets its purpose. In the sign example, a sales assistant must be able to reopen a saved quote and see the same discounted total they gave the customer.

### Who writes the acceptance criteria?

Start with the person who knows the business rule and the person who will build it. Ask someone who does the work to try the example. Agree who can resolve a pricing question and who can accept the delivered feature.

### How do I test an exception?

Change one input that should cause a different outcome. Enter zero signs and try to save. Check the instruction the assistant sees, the draft they can correct and the quote list where no completed quote should appear.

### What if a requirement changes at sign-off?

Write down the new rule alongside the previously agreed one. Assess the delivered version against its original criteria. Before asking for the new behaviour, agree the scope, cost and test that will apply to the change.

## Sources

- [Writing user stories](https://www.gov.uk/service-manual/agile-delivery/writing-user-stories), GOV.UK Service Manual, accessed 19 November 2026
- [Gherkin Reference](https://cucumber.io/docs/gherkin/reference/), Cucumber, accessed 19 November 2026

---

URL: https://hyperhtml.nl/en/knowledge-base/software-acceptance-criteria/  
Updated: 19 November 2026  
HyperHTML, Enschede, eloy@hyperhtml.nl